The first steps of this lesson
Step 1: Which Jobs Are Covered
The federal Renovation, Repair and Painting (RRP) rule, which applies in California jobs, covers renovation work done for compensation in housing and child-occupied facilities built before 1978. Prep counts: scraping, sanding and removing paint before a repaint disturb painted surface. The firm must be EPA certified and the work directed by a certified renovator. The rule assumes any house built before 1978 contains lead-based paint unless a certified inspector or risk assessor, or a certified renovator using an EPA-recognized test kit or paint-chip lab analysis, determines the surfaces are lead-free (EPA Renovator Student Manual 2026, PDF pp. 47, 49, 64).
Step 2: The Minor Repair Exception: 6 and 20 Square Feet
EPA's Steps to Lead-Safe booklet (2026, p. 7) exempts minor repair and maintenance of 6 square feet or less of painted surface per interior room, or 20 square feet or less per exterior project. The exemption is lost for window replacement, demolition, or any prohibited practice. The Student Manual (PDF p. 29) adds two counting rules: the entire surface area of a removed component counts as disturbed, and work other than emergency renovations done within a 30-day period is the same job. Rooms are measured one at a time.
The remaining 3 steps, the worked example and the quiz are in the course. This is a preview. The full lesson, with the step-by-step explanations, a worked example and a quick-check quiz, is inside the classroom.
Independent exam preparation. Contractors Classroom is not affiliated with the Contractors State License Board, and no course can guarantee a passing result.