The first steps of this lesson
Step 1: A Lane Closure Is a Chain of Distances
From the driver's side, a lane closure on a freeway is a sequence: advance warning signs, then the arrow board and merging taper, then a buffer space, then the work area. 2025 Caltrans Standard Plan T10 draws that layout for freeways and expressways, and Standard Plan T9 supplies three tables that put numbers on it: Table 1 (taper length and device spacing), Table 2 (buffer space and flagger station spacing) and Table 3 (advance warning sign spacing). CA MUTCD 2026 Section 6B.08 says that on State highways the Standard Plans T9 through T27 should be used.
Step 2: Advance Warning Sign Spacing (T9 Table 3)
Table 3 gives three distances, A, B and C. A is from the start of the taper back to the first sign, B is from the first sign to the second, and C is from the second to the third. For an expressway or freeway they are 1,000, 1,500 and 2,640 feet. For other roads: urban 25 mph or less is 100 feet each; urban more than 25 up to 40 mph is 250 feet each; urban more than 40 mph is 350 feet each; rural is 500 feet each. The table notes say the distances are approximate guidance and may be adjusted by the Engineer for field conditions. CA MUTCD 2026 Table 6B-1 prints a different urban breakdown (for example 35 mph is 200 feet), so use the table your contract or agency names.
The remaining 3 steps, the worked example and the quiz are in the course. This is a preview. The full lesson, with the step-by-step explanations, a worked example and a quick-check quiz, is inside the classroom.
Independent exam preparation. Contractors Classroom is not affiliated with the Contractors State License Board, and no course can guarantee a passing result.