The first steps of this lesson
Step 1: Cover: The Concrete Between the Steel and the Outside
Caltrans Section 52-1.03D says that unless otherwise shown, reinforcement must have a 2-inch clear cover measured from the surface of the concrete to the outside of the reinforcement. For footings and stem walls in Seismic Design Categories D0, D1 and D2, 2025 CRC R403.1.3.5.3 says steel in concrete cast against the earth has a minimum cover of 3 inches; concrete cast in removable forms exposed to the earth or weather needs 1-1/2 inches for No. 5 bars and smaller and 2 inches for No. 6 bars and larger; concrete in removable forms not exposed to earth or weather, and concrete cast in stay-in-place forms, needs 3/4 inch.
Step 2: Tolerance and Support
For wall reinforcement, R608.5.4.1 adds that the minus tolerance for cover may not exceed the smaller of one-third of the required cover and 3/8 inch: for 3 in. of cover that is the smaller of 1 in. and 0.375 in., so 2-5/8 in. is the least you may accept. Bars must be secured in the forms with tie wire or another bar support system so they cannot move during the pour (R403.1.3.5.3). Caltrans 52-1.03D says to hold bars by wiring at intersections and splices and by precast mortar blocks or ferrous metal chairs, spacers, hangers or supporting wires strong enough not to crush; do not use aluminum, plastic or wood supports, and do not place bars on layers of fresh concrete as the work progresses.
The remaining 3 steps, the worked example and the quiz are in the course. This is a preview. The full lesson, with the step-by-step explanations, a worked example and a quick-check quiz, is inside the classroom.
Independent exam preparation. Contractors Classroom is not affiliated with the Contractors State License Board, and no course can guarantee a passing result.