The first steps of this lesson
Step 1: What D-39 Erects and Which Order Applies
CSLB defines D-39 Scaffolding as erecting metal or wood scaffolding, including temporary sidewalk sheltered construction work barricades (CSLB, Get Licensed to Build, D-39). The load, plank and platform numbers for every scaffold come from Cal/OSHA Title 8, Construction Safety Orders, Section 1637 General Requirements (8 CCR 1637). Later sections (1640 light-duty pole scaffolds, 1644 metal scaffolds, and so on) add rules for each type, but the duty class and plank table in 1637 are the starting point for any deck you plan.
Step 2: Duty Classes and the 4-to-1 Design Rule - 8 CCR 1637(b)(2)
Each scaffold must be designed and built with a dead load safety factor so it supports, without failure, its own weight and 4 times the maximum intended working (live) load. The maximum intended working loads are: light-duty 25 pounds per square foot of work platform, medium-duty 50, heavy-duty 75, and special-duty more than 75 as determined by a qualified person or a registered California Civil Engineer; engineered scaffolds are determined by that engineer. A scaffold must never carry more than its maximum intended working load (1637(b)(3)), and that load must be posted at a conspicuous location at the jobsite or given to each supervisory employee (1637(b)(6)).
The remaining 3 steps, the worked example and the quiz are in the course. This is a preview. The full lesson, with the step-by-step explanations, a worked example and a quick-check quiz, is inside the classroom.
Independent exam preparation. Contractors Classroom is not affiliated with the Contractors State License Board, and no course can guarantee a passing result.