The first steps of this lesson
Step 1: Why the Drain Needs an Air Gap
A softener regeneration drain or an RO reject line carries water that came from the potable supply, and it ends at a sewer-connected drain. CPC Section 603.4.4 says direct connections between potable water piping and sewer-connected wastes shall not be permitted to exist under any condition, with or without backflow protection. CPC Section 611.2 therefore requires discharge from drinking water treatment units to enter the drainage system through an air gap in accordance with Table 603.3.1, or an air gap device that complies with Table 603.2, NSF/ANSI 58, or IAPMO PS 65.
Step 2: Find the Effective Opening
The size of the required gap comes from the effective opening. Table 603.3.1 note 3 defines it as the minimum cross-sectional area at the seat of the control valve or the supply pipe or tubing that feeds the device or outlet. Where two or more lines supply one outlet, the effective opening is the sum of the cross-sectional areas of the individual supply lines or the area of the single outlet, whichever is smaller. Measure the feed that really limits the flow, not the drain hose.
The remaining 4 steps, the worked example and the quiz are in the course. This is a preview. The full lesson, with the step-by-step explanations, a worked example and a quick-check quiz, is inside the classroom.
Independent exam preparation. Contractors Classroom is not affiliated with the Contractors State License Board, and no course can guarantee a passing result.