The first steps of this lesson
Step 1: Boxes in a Rated Wall Are Membrane Penetrations
When a cutout is made in the board of a fire-resistance-rated wall for an electrical box, 2025 CBC Section 714.4.2 treats it as a membrane penetration. It must comply with Section 714.4.1 (a firestop system installed as tested in the approved assembly, or an approved penetration firestop system), and recessed fixtures must be installed so the required fire resistance is not reduced. Six exceptions then say when electrical boxes are allowed without a separate firestop system. The cutout size and gap are yours; the limits are printed numbers.
Step 2: Exception 1: Steel Boxes in Walls Rated 2 Hours or Less
Steel electrical boxes are allowed in walls and partitions rated up to 2 hours when each box does not exceed 16 sq in. in area, the aggregate area of the openings through the membrane does not exceed 100 sq in. in any 100 sq ft of wall area, and the annular space between the board and the box does not exceed 1/8 in. So the gap around a box is a pass/fail number, and a loose cutout fails it.
The remaining 3 steps, the worked example and the quiz are in the course. This is a preview. The full lesson, with the step-by-step explanations, a worked example and a quick-check quiz, is inside the classroom.
Independent exam preparation. Contractors Classroom is not affiliated with the Contractors State License Board, and no course can guarantee a passing result.