The first steps of this lesson
Step 1: Closure Needs Sampling, and a Certified Contractor
California Code of Regulations Title 23 §2681(g) requires the owner or operator of an underground storage tank system being permanently closed to perform soil sample analysis and, if water is present in the excavation, groundwater analysis. B&P Code §7058.7(e)(1) says a contractor may not install or remove an underground storage tank unless the contractor passed the HAZ certification exam, and §7058.7(e)(2) lets an uncertified contractor bid only if a certified contractor performs the work. So the sampling plan is part of the removal job the HAZ contractor is expected to understand. Soil and groundwater are analyzed as required by the Cleanup Oversight Agency for all hazardous substances previously stored in the tank (§2681(g)(1)).
Step 2: Where the Soil Samples Go
§2681(g)(1) says soil samples must be collected a minimum of two feet into native soil, immediately beneath: (A) each end of the tank; (B) the midpoint of each tank with a capacity greater than 12,000 gallons; (C) each internal bulkhead of compartmented tanks; (D) all hazardous substance piping at 20 linear-foot intervals, with additional samples collected at each change in direction for rigid piping; and (E) each dispenser. Memorize the 12,000-gallon threshold: a 12,000-gallon tank does not get the midpoint sample, a 12,001-gallon tank does.
The remaining 3 steps, the worked example and the quiz are in the course. This is a preview. The full lesson, with the step-by-step explanations, a worked example and a quick-check quiz, is inside the classroom.
Independent exam preparation. Contractors Classroom is not affiliated with the Contractors State License Board, and no course can guarantee a passing result.