Hazardous Substance Removal (HAZ) · Lesson 6 of 6UST Releases: The 8-Hour, 24-Hour, 5-Day and 45-Day Clock
"UST Releases: The 8-Hour, 24-Hour, 5-Day and 45-Day Clock" is lesson 6 of 6 in the Hazardous Substance Removal (HAZ) Learning Hub. It opens with "Recordable vs Reportable Releases" and works through 6 short steps, then a worked example you can check yourself against.
One-time purchase, no subscription. Law & Business included.
The first steps of this lesson
Step 1: Recordable vs Reportable Releases
23 CCR §2670 covers a release from primary containment that is only recorded: the operator's monitoring record must include the operator's name and telephone number, the types, quantities and concentrations of hazardous substances released, the actions taken to control and clean up the release, the method and location of disposal (and whether a hazardous waste manifest was or will be used), and the repair actions taken, including resuming interstitial monitoring (§2670(b)). A recordable release becomes reportable under §2671(a)(1) if the owner or operator is unable to stop and clean it up, or if it remains under investigation eight hours after detection. It also becomes reportable if initially unanticipated facts change the picture (§2670(d)).
Step 2: What Triggers a Report
Under 23 CCR §2671(a), the owner or operator must record and give a preliminary written report to the Unified Program Agency (UPA) for any release that escapes from secondary containment, plus any of these: the discovery of released hazardous substances at the tank site or surrounding area, including free product or vapors in soils, basements, sewer and utility lines, and nearby surface or drinking waters (§2671(a)(2)); unusual operating conditions such as erratic dispenser behavior, sudden loss of substance from the tank, or unexplained water in the tank (§2671(a)(3)); and release detection monitoring results that indicate a release may have occurred (§2671(a)(4)). Equipment found defective and promptly fixed, with no release and no confirming results, can be excused under (a)(3)(B) and (a)(4).
The remaining 4 steps, the worked example and the quiz are in the course. This is a preview. The full lesson, with the step-by-step explanations, a worked example and a quick-check quiz, is inside the classroom.
Independent exam preparation. Contractors Classroom is not affiliated with the Contractors State License Board, and no course can guarantee a passing result.