The first steps of this lesson
Step 1: Why Every Pipe Trench Needs a Protective System
Pipe crews work at the bottom of the trench, so a cave-in is the hazard that matters most on every pipeline job. California Title 8 section 1541.1(a)(1) requires every employee in an excavation to be protected from cave-ins, with only two exceptions: excavations made entirely in stable rock, and excavations less than 5 feet deep where a competent person finds no sign of a potential cave-in. Section 1539 sends excavation and trench permit questions to Title 8 section 341, so check that before you open the ground.
Step 2: Classify the Soil First: Type A, B, or C
You cannot pick a slope until the competent person classifies the soil under Title 8 section 1541.1 Appendix A. Type A is cohesive soil with an unconfined compressive strength of 1.5 tons per square foot (tsf) or more, and it is never Type A if it is fissured, subject to vibration, or previously disturbed. Type B is greater than 0.5 but less than 1.5 tsf (angular gravel, silt, and sandy loam also fall here). Type C is 0.5 tsf or less, and includes gravel, sand, and loamy sand. Submerged soil or soil with water freely seeping is Type C, and a layered system is classified by its weakest layer. The competent person classifies from at least one visual and one manual test; strength can be estimated with a pocket penetrometer, thumb penetration, or a shearvane.
The remaining 3 steps, the worked example and the quiz are in the course. This is a preview. The full lesson, with the step-by-step explanations, a worked example and a quick-check quiz, is inside the classroom.
Independent exam preparation. Contractors Classroom is not affiliated with the Contractors State License Board, and no course can guarantee a passing result.