The first steps of this lesson
Step 1: Know Which Material You Are Applying
Section 84-2 of the 2025 Caltrans Standard Specifications covers four materials: paint, thermoplastic, methyl methacrylate and warranty tape. Waterborne traffic line paint is State Specification PTWB-01R2 in white, yellow and black, and blue, red and green waterborne paint for the international symbol of accessibility and other curb markings is Federal Specification TT-P-1952F (Section 84-2.02F). Section 84-2.01B counts parking space markings as pavement markings, and Section 84-2.03B(1) says to apply pavement marking material with a stencil or a preformed marking, while a traffic stripe is a longitudinal line.
Step 2: Conditions That Apply to Every Material
Section 84-2.03B(1) says to apply a traffic stripe or pavement marking only to a clean, dry surface when the pavement surface temperature is above 50 degrees F. Section 84-2.03A requires mechanical cleaning of dirt, contaminants and loose material first. Apply the stripe and glass beads in a single pass, embed beads to 1/2 of their diameter, and immediately remove drips, overspray and material tracked by traffic. Protect new work until it is dry or hard enough to bear traffic.
The remaining 3 steps, the worked example and the quiz are in the course. This is a preview. The full lesson, with the step-by-step explanations, a worked example and a quick-check quiz, is inside the classroom.
Independent exam preparation. Contractors Classroom is not affiliated with the Contractors State License Board, and no course can guarantee a passing result.