The first steps of this lesson
Step 1: The BESS-Ready Rule for New Homes
2025 California Energy Code Section 150.0(s) applies to single-family residences with one or two dwelling units where the utility service is greater than 125 amps. Unless a BESS is already installed (the exception), the home must have either BESS-ready interconnection equipment with at least 60 amps of backed-up capacity and at least four BESS-supplied branch circuits, or a dedicated raceway of trade size not less than 1 inch from the main service to a subpanel that supplies those circuits. That subpanel must be labeled "Subpanel shall include all backed-up load circuits."
Step 2: The Four Backed-Up Circuits, the Busbar and the Transfer Switch Space
Section 150.0(s)2 requires at least four branch circuits identified and collocated at a single panelboard suitable to be supplied by the BESS: at least one for the refrigerator, one lighting circuit near the primary egress, and at least one sleeping room receptacle outlet. Section 150.0(s)3 requires the main panelboard to have a minimum busbar rating of 225 amps. Section 150.0(s)4 requires space reserved for system isolation equipment or a transfer switch within 3 feet of the main panelboard, with raceways installed between the panelboard and that location.
The remaining 3 steps, the worked example and the quiz are in the course. This is a preview. The full lesson, with the step-by-step explanations, a worked example and a quick-check quiz, is inside the classroom.
Independent exam preparation. Contractors Classroom is not affiliated with the Contractors State License Board, and no course can guarantee a passing result.