Step 1: Which Buildings Must Have PV and a Battery
2025 California Energy Code Section 140.10(a) requires a newly installed PV system (meeting Joint Appendix JA11) on newly constructed buildings of the types listed in Table 140.10-A: events and exhibits, library, hotel/motel, office/financial institution/unleased tenant space/medical office building or clinic, restaurants, retail and grocery, school, warehouse, religious worship, sports and recreation, and multifamily over 3 stories. A mixed-occupancy building is covered where at least 80 percent of its floor area is one or more of those types; you apply the equation to each type's conditioned floor area and add the results. Section 140.10(b) then requires a battery energy storage system (BESS, meeting JA12) on any building that must have the PV system.
Step 2: PV Capacity: Equation 140.10-A
The minimum rated PV capacity is kWpvdc = (CFA x A)/1000, where CFA is conditioned floor area in square feet and A is the PV capacity factor in W per square foot from Table 140.10-A for the building type and climate zone. Example values from the table: Retail/Grocery in Climate Zone 12 is 3.64, School in Climate Zone 12 is 1.63, and Warehouse in Climate Zone 1 is 0.39. Dividing by 1000 turns watts into kW.
The remaining 3 steps, the worked example and the quiz are in the course. This is a preview. The full lesson, with the step-by-step explanations, a worked example and a quick-check quiz, is inside the classroom.
Independent exam preparation. Contractors Classroom is not affiliated with the Contractors State License Board, and no course can guarantee a passing result.